Page 3.  Link to page 1.  Link to page 2.
2 months later. Still going.
Still a long way and a lot of mess and inconvenience to go.
All the new rooms floors are now screeded with the underfloor heating pipes layed.

6th March.

Inside the new kitchen.

They had a bit of trouble fitting this.

Inside this doorway are 2 beds and a bathroom.

A bit later they got both sets of doors in.

Out the front we have an eyebrow window once more and a couple of bedroom windows done.

13th March

We have a dormer. Woot.
The ridge tiles and bonnets are yet to be cemented in.

The loft hallway, store room to the left, bathroom right. I'm standing in the doorway to the main room.

Inside of the dormer.

Inside the eyebrow. All those rafters need to be trimmed.